Files
OneCAD-Simulation/tests/oracle/j2-bauschinger/README.md
T
jyvikoandClaude Opus 5.5 7a69fe5e2f verification: implicit plasticity oracle cases and documentation
Four cases, each against its closed form: uniaxial tension of a J2 cube to a
logarithmic strain of 0.2 (Kirchhoff stress exact; 0.13 % from the explicit
solver's hypoelastic Cauchy stress, the elastic volume change between the two
laws), the Bauschinger effect of linear kinematic hardening on a load path
back to zero strain (exact), Hill's elastic-perfectly plastic thick cylinder
(bore displacement at a plastic radius of 1.5a within 0.009 %, collapse
pressure within 2e-8; the pending case is now active) and a cantilever's
plastic collapse, converged 3.1 % above beam theory's hinge, the bound a
continuum exceeds. docs/fem.md, the literature, ROADMAP (M15), parity and the
oracle page follow.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01NmAttHhUZTokgPeEJia8sm
2026-10-14 06:03:36 -04:00

13 lines
870 B
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Bauschinger effect of linear kinematic hardening
One hex8 cube (E = 200000, ν = 0.3, σ_y = 250, H = 2000, Prager's linear kinematic hardening)
held by symmetry on three faces, its fourth face pulled to a strain of 0.01 and brought back to
zero within one nonlinear static step without nonlinear geometry, by the load path
[[0, 0], [0.5, 1], [1, 0]] in increments of 0.05.
At ε_a the stress is σ_a = σ_y + E_t (ε_a − σ_y/E) = 267.327. The yield surface keeps its size
and moves with the back stress, so unloading is elastic only until σ_a − 2σ_y and then hardens
with E_t: back at zero strain σ = σ_a − 2σ_y − E_t (ε_a − 2σ_y/E) = −247.525. Isotropic hardening
would yield again only at −σ_a and end at −281.835. The equivalent plastic strain accumulates
(σ_a − σ_y)/H forward and E/(E + H)(ε_a − 2σ_y/E) in reverse, 0.0160891.